Winter Maintenance for BAC Cooling Towers: A Practical Cold-Weather Operating Plan

Writer: TPSS Experts
TPSS Experts
Nov 4
8 min read

Winter operation places a cooling tower in one of its most demanding conditions. The heat load may fall, but the risk of uneven water distribution, frozen components, unstable controls, stagnant water, fan problems, and unplanned downtime rises.


Large industrial cooling towers and pipes in a snowy outdoor facility under a gray sky.

For a Baltimore Aircoil Company cooling tower, the right winter strategy begins with the exact model, serial number, installed accessories, certified drawing, and operating manual. BAC offers many equipment configurations, including the crossflow Series 3000 and Series 1500, counterflow PT2, centrifugal-fan Series V, industrial Series 5000, and several closed-circuit products. Those differences affect airflow, service access, water distribution, drive systems, and cold-weather procedures.


The goal is not to apply one universal winter rule. It is to build a coordinated plan for the equipment actually installed.


Begin with the BAC Equipment Record


Before inspecting the tower, assemble the operating package:

  • BAC model and serial number

  • Product-specific operating and maintenance manual

  • Certified equipment drawing

  • Original selection and design conditions

  • Fan and drive information

  • Heater, remote-sump, and control submittals

  • Approved sequence of operation

  • BAS points and alarm list

  • Water-treatment program

  • Previous inspection and repair records


BAC maintains an online manual library organized around specific equipment models. Project teams should use that model-specific material rather than relying on instructions for a similar-looking tower.


For certain units, BAC also directs owners to contact the local representative using the model and serial-number information located near the access door.


Determine the Winter Operating Mode


The maintenance plan should identify how the tower will operate under four distinct conditions.


Continuous wet operation


Facilities with year-round cooling loads may operate the tower during freezing weather. The system needs:

  • Adequate flow through each active cell

  • Reliable water distribution

  • Stable leaving-water-temperature control

  • An approved fan-speed range

  • Freeze protection during low load and standby

  • Continuous treatment and monitoring

  • An operator response for visible ice


Hospitals, laboratories, higher-education facilities, industrial plants, and buildings with large interior loads commonly require this level of planning.


Intermittent wet operation


Intermittent operation can create additional risks because equipment repeatedly starts, stops, drains, refills, or remains wet between calls for cooling.


Document:

  • What enables the condenser-water or spray pump

  • Which cells and valves open

  • How flow is proven

  • When the fan is allowed to start

  • What happens after the pump stops

  • Which components drain

  • How idle cells are treated

  • How the system responds to a power failure


The CDC recommends avoiding stagnation and dead legs, recirculating water during intermittent operation, and using automated treatment controls.


Dry operation


Some BAC closed-circuit or hybrid products may support dry operation under appropriate conditions. A closed-circuit tower contains an internal process-fluid loop and an external spray-water circuit. Switching to dry operation does not remove the need to protect or properly drain the external water system.


The exact dry-operation sequence should come from the manual for the installed product. It should explain:

  • Whether the spray pump stops

  • Whether the basin drains

  • How coil fluid is protected

  • How valves are positioned

  • What minimum process-fluid flow is required

  • When wet operation resumes


Seasonal shutdown


A seasonal shutdown should cover:

  • Cleaning and disinfection

  • Basin and piping drainage

  • Trapped-water inspection

  • Makeup-water isolation

  • Treatment-system shutdown

  • Heat-trace requirements

  • Electrical isolation

  • Fan and drive preservation

  • Spring recommissioning


The CDC recommends cleaning and disinfecting according to manufacturer guidance before startup, after shutdown, and when the system has been idle. It also recommends an offline cleaning and disinfection at least annually.


Maintain Adequate Water Flow


Water flow is one of the most important variables in cold-weather operation. Excessive turndown can produce uneven distribution, leaving some areas dry and concentrating water in others. Localized conditions can then promote icing, reduce thermal performance, and stress fill or other components.


The winter sequence should identify:

  • Design flow for the tower

  • Minimum acceptable flow per active cell

  • Cell staging order

  • Pump-speed limits

  • Bypass-valve limits

  • Flow-proof requirements

  • Response to loss of flow

  • Treatment of isolated cells and equalizer lines


In a multicell system, operating fewer cells with adequate water loading may be preferable to spreading insufficient flow across every cell. That decision should be verified against the BAC manual and approved by the system engineer.


During inspection, check:

  • Strainers

  • Distribution basins

  • Spray branches

  • Nozzles or orifices

  • Balancing valves

  • Headers

  • Makeup assemblies

  • Evidence of uneven distribution

  • Debris, scale, or biological deposits


Fan operation should not be used to compensate for a water-distribution problem.


Verify Fan and VFD Operation


A VFD can provide useful capacity control, but not every speed is mechanically acceptable.

BAC’s Series 1500 instructions warn that when fan speed is changed from its factory setting, including through a variable-speed device, the system must avoid operation at or near the fan’s critical speed. BAC instructs users to consult the local representative for those applications.


For each tower, document:

  • Minimum and maximum approved fan speed

  • Any prohibited or critical-speed range

  • Acceleration and deceleration requirements

  • Fan cycling limitations

  • Vibration-switch setpoints

  • Low-temperature fan lockout

  • Sensor-failure fallback

  • Whether reverse operation is permitted


Do not assume fan reversal is an acceptable de-icing strategy. It should only be used when expressly authorized for the exact BAC model, fan, drive, and operating condition.


Inspect the complete drive system:

  • Fan blades and pitch

  • Blade clearance

  • Bearings

  • Belts and sheaves

  • Gear drive and lubricant

  • Couplings and shafts

  • Motor and motor space heater, if furnished

  • Guards

  • Vibration cutoff switch

  • Mounting hardware

  • Abnormal sound or vibration


BAC’s maintenance guide includes reference procedures for vibration cutoff switches, bearing maintenance, belt tension, sheave alignment, fan installation, motor orientation, pump selection, and water-quality guidance.


Understand What a Basin Heater Protects


A basin heater protects the cold-water basin against freeze-up when properly selected, installed, powered, controlled, and submerged. It should not be treated as freeze protection for the entire condenser-water system.


BAC describes its immersion basin heaters as UL- and CSA-rated devices intended to prevent cold-water-basin freeze-up. Available configurations vary in voltage, phase, capacity, and element length.


A separate evaluation is needed for:

  • Makeup-water piping

  • Equalizer piping

  • Overflow and drain lines

  • Pump connections

  • Exposed risers

  • Level-control piping

  • Chemical-feed tubing

  • Sensors and pressure taps

  • Idle branches

  • Valves outside the heated basin

  • Piping that does not drain completely


BAC heater controls can include a single probe that senses water temperature and level, contactors, a 24-volt control transformer, and a NEMA 4 enclosure.


Before winter, functionally test:

  1. The heater only operates when required.

  2. The element remains properly submerged.

  3. The low-water cutoff prevents dry firing.

  4. The contactor energizes correctly.

  5. The temperature sensor responds accurately.

  6. The heater is interlocked appropriately with pump operation.

  7. The BAS receives the required alarm or status.

  8. The branch circuit and disconnect are correctly identified.


A graphics-screen command is not proof that the heater is producing heat. Verify voltage, current, and control response using qualified electrical personnel and safe test procedures.


Evaluate a Remote Sump Where Appropriate


BAC remote sump tanks are typically installed indoors in conditioned space. When the pump stops, recirculating water can drain from the outdoor tower, closed-circuit cooler, or evaporative condenser into the indoor tank. BAC states that this arrangement can eliminate the need for cold-water-basin heaters and can centralize water-quality monitoring for multicell installations.


A remote sump is not automatically freeze-proof. Successful operation depends on:

  • Correct piping slope

  • Adequate pipe diameter

  • Open drain paths

  • Proper air relief

  • Absence of traps

  • Sufficient tank volume

  • Correct operating level

  • Reliable pump suction

  • Protection of makeup and overflow piping

  • Controls coordinated with drain-down

  • Verification after field modifications


A remote sump may be a strong long-term solution for frequently operated winter systems, but it is a design decision rather than a substitute for maintenance.


Keep the Water-Management Program Active


Winter does not eliminate microbial risk. Reduced load can increase water age, create stagnant cells, or produce inconsistent chemical control.


The CDC identifies four central Legionella risk factors in cooling towers:

  • Sediment and biofilm

  • Temperature

  • Water age

  • Disinfectant residual


The CDC recommends automated disinfectant control, avoidance of stagnation, appropriate recirculation during intermittent operation, and a formal water-management program.


OSHA also emphasizes routine inspection, cleaning, disinfection, and documentation. Recommended records include system descriptions, operating procedures, treatment use, inspection and cleaning dates, sampling results when sampling is performed, and maintenance activities.


The winter plan should define:

  • Responsible members of the water-management team

  • Treatment control limits

  • Monitoring frequency

  • Bleed and makeup operation

  • Conductivity control

  • Corrective actions

  • Management of idle cells

  • Cleaning and disinfection triggers

  • Sampling policy

  • Record retention

  • Response to an out-of-limit condition


ASHRAE Standard 188-2021 establishes minimum Legionella risk-management requirements for building water systems. ASHRAE Guideline 12-2023 provides additional control guidance, while Standard 514 addresses broader physical, chemical, and microbial water-system risks.


Inspect the Tower Structure and Heat-Transfer Components


Inspect for:

  • Scale and biological deposits

  • Damaged or displaced fill

  • Blocked airflow passages

  • Damaged louvers

  • Deteriorated drift eliminators

  • Corrosion

  • Loose fasteners

  • Cracked fiberglass

  • Coating failure

  • Sealant failure

  • Standing water

  • Structural deformation

  • Evidence of previous ice loading


The CDC recommends high-efficiency drift eliminators and advises locating cooling towers at least 25 feet from building air intakes to reduce the possibility of drift entering the ventilation system.


For an existing installation, do not relocate equipment or add screens without an engineering review. Airflow changes can affect recirculation, capacity, sound, plume behavior, and structural loading.


Manage Ice Through an Approved Procedure


Some ice may appear during freezing operation, but its location, rate of growth, and effect on the equipment determine whether the condition is manageable.


Escalate when ice:

  • Approaches the fan or rotating equipment

  • Restricts airflow

  • Blocks water distribution

  • Loads fill, louvers, eliminators, or structural components

  • Produces abnormal vibration

  • Creates falling-ice hazards

  • Blocks access

  • Grows rapidly or asymmetrically

  • Appears outside the conditions anticipated by BAC


Do not strike fill, louvers, eliminators, basins, coils, piping, or structural members with impact tools. Do not use an improvised fan-reversal sequence.

Apply the facility’s lockout/tagout, electrical-safety, fall-protection, chemical-handling, and PPE procedures before inspection or corrective work. OSHA notes that cooling towers can expose workers to aerosols and emphasizes proper maintenance, disinfection, and worker protection.


Functionally Test the Complete System


Before freezing weather, test:

  • Condenser-water or spray-pump start and stop

  • Proof-of-flow interlocks

  • Fan enable

  • VFD operation through the approved range

  • Cell isolation valves

  • Bypass valves

  • Basin heaters

  • Heater low-water cutoffs

  • Makeup-water assemblies

  • High- and low-level alarms

  • Low leaving-water-temperature alarms

  • Temperature sensors

  • Conductivity and treatment controls

  • Loss-of-power response

  • BAS alarm transmission

  • Standby-equipment changeover


Trend:

  • Outdoor-air temperature

  • Entering- and leaving-water temperatures

  • Basin water temperature

  • Pump speed and status

  • Fan speed and status

  • Flow, where measured

  • Valve positions

  • Heater status

  • Conductivity

  • Makeup and bleed operation

  • Alarm history


Trend data can expose unstable fan cycling, leaking valves, incorrect sensors, insufficient water flow, simultaneous heating and pumping, or a heater that is commanded on but not operating.


Prioritize Findings by Risk


Immediate correction

  • Fan contact with ice

  • Rapid or structurally significant ice buildup

  • Failed low-water cutoff

  • Dry-fired or damaged heater

  • Frozen or leaking piping

  • Loss of treatment control

  • Failed flow proof

  • Severe vibration

  • Inoperative critical alarm

  • Blocked drain-down path


Short-term repair

  • Damaged insulation

  • Intermittent heat trace

  • Poor nozzle distribution

  • Corroded hardware

  • Unreliable valve actuator

  • Sensor calibration error

  • Minor fill or eliminator displacement


Capital planning

  • Remote sump conversion

  • Controls modernization

  • VFD retrofit with critical-speed evaluation

  • Major basin or casing restoration

  • Chronic low-flow correction

  • Cell-isolation improvements

  • Replacement of obsolete drives or unsupported controls

  • Tower replacement or conversion to a different heat-rejection strategy


Pre-Winter BAC Checklist


Equipment information

  •  BAC model and serial number recorded

  •  Correct BAC manual available

  •  Certified drawing available

  •  Installed accessories documented

  •  Approved winter sequence available

  •  Local BAC representative identified


Mechanical systems

  •  Fan and drive inspected

  •  Critical-speed restrictions documented

  •  Vibration cutoff tested

  •  Strainers and distribution system cleaned

  •  Fill, louvers, and eliminators inspected

  •  Drains and overflow lines verified

  •  Remote-sump drain-down tested, if applicable


Freeze protection

  •  Basin heater amperage and control operation tested

  •  Low-water cutoff tested

  •  Heat-trace circuits tested

  •  Pipe insulation inspected

  •  Makeup and equalizer piping reviewed

  •  Trapped-water locations identified

  •  Power-failure behavior verified


Controls

  •  Flow proof functionally tested

  •  Fan sequence tested

  •  Cell valves stroked

  •  Temperature sensors calibrated

  •  Alarm routing verified

  •  Standby equipment tested

  •  Trends reviewed under low-load operation


Water management

  •  Treatment equipment operational

  •  Control limits documented

  •  Idle cells addressed

  •  Conductivity control tested

  •  Cleaning and disinfection documented

  •  Corrective-action responsibilities assigned


Safety and response

  •  Lockout/tagout procedure current

  •  Fall and ice hazards evaluated

  •  PPE available

  •  Unsafe ice-removal methods prohibited

  •  Emergency contacts current

  •  Night and weekend response established


The Bottom Line


Reliable winter operation of a BAC cooling tower depends on the interaction of water flow, fan control, freeze protection, drainage, water treatment, mechanical condition, and operator response.


For an owner, the payoff is reduced outage and repair risk. For facilities staff, it is a repeatable procedure instead of an improvised response during a freeze. For engineers and contractors, it is a system whose intended operation can be tested and documented. For healthcare and education facilities, it supports both continuity and responsible water management.


The best first step is to place the exact BAC manual, certified drawing, winter sequence, control limits, inspection findings, and alarm-response plan into one asset-specific operating package. Then functionally test that package before freezing conditions expose its weaknesses.

Comments


Commenting on this post isn't available anymore. Contact the site owner for more info.
TPSS_Banner.png

CONTACT US

Lexington Office

680 Bizzell Dr, Lexington, KY 40510

Phone: 859.899.0304

​

Louisville Office

13151 Middletown Industrial Blvd, Louisville, KY 40223

Phone: 502.451.6100

​

Paducah Office

115 Eaglet Cove, Paducah, KY 42003

Phone: 502.451.6100

Thanks for submitting!

bottom of page